Project |
Client |
Location |
Description |
Renovation of quay bridge |
Skanska Asfalt och Betong AB |
Klintemåla |
Reperation of two pieces concrete support and edge beam. Hydrodemolition, reinforcement, molding and casting support. |
Bridge renovation |
Skanska Asfalt och Betong AB |
Flatvarp |
Hydrodemolition, forming, reinforcing and casting of bridge supports. |
Bridge renovation |
Skanska Asfalt och Betong AB |
Hasslö |
Forming, reinforcement and casting of bridge supports. |
Bridge renovation |
Skanska Asfalt och Betong AB |
Ronneby |
Forming, reinforcement and casting of bridge supports. |
Water and Sewage pipe "Broheden-Grelsbyn" |
Skanska Sverige AB, Väg och Anläggning Norr |
Överkalix kommun |
Lowering of water and sewage pipe. Work on and under meter thick ice. |
S1 Backbone Torsång |
Skanska Sverige AB |
Torsång |
Weighting and lowering the protective tube over Dalälven, for fiber optic cables. |
S1 Backbone Siljan |
Skanska Sverige AB |
Siljan |
Mechanical dredging of the protective tube and 7.5 km collocation of fiber optic cable. |
Drinking water-pipe Insjön |
Grytnäs Gräv AB |
Insjön |
Weighting, dredging and lowering the protectice pipe in Österdalälven, for drinking water pipelines. |
Construction of quay |
Peab Anläggning AB |
Mörbylånga Quay, Öland |
New construction of quay. Forming, reinforcement and casting of base and quay wall. |
Demolition of bottom air ducts in two purification pools |
Stora Enso Paper AB Nymölla Mill |
Nymölla |
Demolition of bottom air ducts in two purification pools (3 tons each) as well as excavation before installing new bottom air conditioners. |
Outlet tunnel renovation |
Peab Anläggning AB |
Västerås |
Cast two sheet piled walls in an outlet tunnel for MälarEnergi. |
Construction of loading dock |
Länsstyrelsen i Kalmar |
Vållö |
Construction of loading dock on Vållö |
Renovation of Nogersunds Hamn |
Sölvesborgs kommun |
Nogersund |
Renovation of the harbor in three stages. Crown beam and masonry boulders. |